Industrial Park
Prologis Park Lerma III, Toluca
Problem
Foundation Area: Saturated clay soils, where traditional solutions required deep excavations, the use of rockfill, and high costs.
Solution
With the PRS-Neoloy® System, a stable foundation surface was created to support the rest of the pavement platform structure.
Construction Savings: 28%
Reduction in Construction Schedule: 30%
Maintenance Savings: 50%
Carbon Footprint Reduction: 35%
Refinery Platforms next…

Español